Day 2 - a metre lower

A lot of shattered rock on the ground. So far the dozer is ripping through the shale and shattering it into a zillion pieces as you can see. A good metre has been taken out, and another two to go.

Comments

Popular posts from this blog

Wires for power and wires for balustrades.

Mucking around on the boat deck

August Drone Report