Day 2 - a metre lower

A lot of shattered rock on the ground. So far the dozer is ripping through the shale and shattering it into a zillion pieces as you can see. A good metre has been taken out, and another two to go.

Comments

Popular posts from this blog

Wires for power and wires for balustrades.

Drone view - landscape update