Day 3 of excavation
Down futher... The spoil piles are massive. The base is solid shale. The dozer can rip through it at a very slow rate. About half a metre a day, and this is only the shed pad. The same again needs doing for the house pad. I think the dozer will be here for 3 weeks at this rate...