After three weeks of terraforming the block to address a 1 in 100 year storm, we finally got around to the main event of digging the foundation trenches. The shed pad is well advanced with bedding dust.
My block is now resembling an estate development with almost all grass trampled on by the machinery and diggings. My neighbour has decided to address their issues with water run-off, well after their house being built. The same story is happening with the new builds all down the street. With the help of my groundworks manager, Paul, my water issues are being addressed from the outset with serious swales and drains. THe trenches are all ready for the final power and NBN conduits, and water pipes are in the ground with numerous garden taps. I am waiting for council to put in the sewer pipe, then all landscape digging will be complete. The tanks are now all in-situ.
Comments
Post a Comment