Sunny days are back again. The excess water pumped out to allow for big footings for the house columns to be poured. That is over three cubic metres per footing, or over four tonnes, bolted to each column.
Wires for power and wires for balustrades.
A little more progress over the last fortnight. I just have a couple of my regulars working on the balustrades and wiring the balustrades. It looks SO much better to remove the plywood boarding around the "house deck". Meanwhile we approacing the completion of the landscaping features with the build of the balustrade. I am pleased with the detail we came up with to hover a piece of flat steel over the balustrade of the "boat deck", which is already being called the "Titanic".