Significant Day

Two significant milestones today. Firstly the gutter-cum-footpath above the wall has finally been poured which is the last critical piece in place to allow the wall to do its job in protecting the site from erosion.
Secondly, two of five or six truckloads of fabricated steel arrived. Erection was planned for next week, but with the rain forecast, it will likely commence the week after next and take two or three weeks.