Improving the upper footpaths

Well, after all of the headache of building the retaining wall over the last two months we are all set to add the final piece of the puzzle which is to concrete the capping gutter. Everything is in place, but just my luck, not one of the seven concrete pumps in this town is available. Apparently one is on the blink, but the other six are all booked to Baiada to do a massive expansion of their facility for terminating chooks. It is very frustrating because we need to do this before the shed and house frames are erected, which is booked for the week after next.
Making the most of the situation, we have hired a small excavator to tidy up and level the pathways above the house. They were originally cut with the big excavator reaching up, but that created just a 1m wide rough cut. The small excavator has made them twice as wide. They too will be concreted, and so perhaps when we do get a pump, both the gutter, which is itself a path, as well as the upper paths can be poured.

Comments

Popular posts from this blog

Dramatic change

Another Day, Another Year