A bridge not too far

With the frame finished and inspector satisfied we enter the next phase aimed for lock-up. I just ordered the ground floor windows, so now a wait of six weeks or so before they arrive.

In the meantime we are tackling those fiddly extra jobs that will make the house surrounds so much more functional. These include putting up the hand rail cables for the footpaths, a metal rim to protect the concrete edge for the house/shed apron and of course completing the bridge from the house veranda deck to the footpaths.

The Cable



The Rim



The Bridge

Comments

Popular posts from this blog

Wires for power and wires for balustrades.

Drone view - landscape update